Printable PagePrintable Page Email This PageEmail This Page

Custom Steel Fabrication of Carbon Steel Tubes for the Nuclear Power Industry

Carbon Steel Tubes for Nuclear Power Plants
Carbon Steel Tubes for Nuclear Power Plants

Harmony Metal Fabrication was approached by a client in the nuclear power industry to manufacture carbon steel tubes that would be used in a power plant. Following the customer supplied 3D CAD drawings, we fabricated the tubes from carbon steel using machining processes such as sawing, drilling, and milling. Sand blasting and spray painting the tubes with gray epoxy finished the tubes per the customer requirements. The tubes had a final dimension of 6" x 6" with a wall thickness of ¼". The tubes varied in lengths through 40" and weighed 1,000 lb. We manufactured these tubes to tolerances of ±1/16" and performed inspection testing to ensure that the tubes met all required specifications.

To learn more about this carbon steel tube fabrication project, please see the table below or contact Harmony Metal Fabrication today.

Request A Quote

Custom Steel Fabrication Project Highlights

Product Name
Carbon Steel Tube
Product Description
This carbon steel tube is used within a nuclear power plant.
Capabilities Applied/Processes
Sawing
Drilling
Milling
Sand Blasting
Painting
  • Epoxy Painted
  • Spray Gun
  • Crating
Equipment Used to Manufacture Part
Vertical Band Saw
Drill Press
Milling Machine
Overall Part Dimensions
6" x 6" x ¼" Wall Thickness
Length: Up to 40"
Tightest Tolerances
±1/16"
Material Used
Carbon Steel
Material Finish
Gray
In Process Testing/Inspection Performed
Final Inspection
Estimated Part Weight
1,000 lbs
Industry for Use
Nuclear Power
Turnaround Time
4-5 Weeks
Delivery Location
U.S. Southeast Region
Standards Met
3D CAD Drawing
View Other Past Projects